Horizontal pressure on barricades for backfilled stopes. Part II, Submerged conditions |
Type de document : |
texte imprimé |
Auteurs : |
Li, L., Auteur ; Michel Aubertin, Auteur |
Article en page(s) : |
pp. 47–56 |
Note générale : |
Sciences de la Terre |
Langues : |
Anglais (eng) |
Mots-clés : |
Backfill Barricades Total stress Effective Analytical solution Numerical modelling Remblai Contrainte totale effective Solution analytique Modélisation numérique |
Index. décimale : |
550 Sciences auxiliaires de la géologie. |
Résumé : |
This paper presents a method to calculate the pressure generated by submerged backfill on barricades (or bulkheads) located in drifts at the base of mine stopes. The paper complements Part I (see companion paper, this isue), which presents an analytical solution for the pressure on barricades when the backfill is in drained conditions (after the pore-water pressure has dissipated). The solution presented here applies shortly after backfill deposition, for undrained conditions. In this case, the effect of pore pressure cannot be neglected as it may be critical for the response of barricades. The solution is developed for totally or partly submerged backfill (with the water table at various elevations). Experimental testing and numerical modelling results are used to validate the proposed equations. Both numerical and analytical results show that the total pressure on barricades can be significantly increased by pore pressure, while the effective stress is decreased in the access drifts (compared to dry or drained conditions). The proposed solution provides a simple method to obtain a realistic estimate of the total and effective stresses, and can thus be used as a basis for barricade design.
Cet article présente une méthode pour calculer la pression générée par des remblais submergés sur des barricades localisées dans des galeries en bas des chantiers remblayés. Cet article complémente la Partie I (voir article précédent, ce numéro), qui a présenté une solution analytique pour la pression sur des barricades lorsque le remblai est sous la condition drainée (après que la pression interstitielle soit dissipée). La solution présentée ici s’applique peu après la déposition du remblai, en conditions non drainées. Dans ce cas, la pression interstitielle ne peut pas être négligée car elle peut devenir critique pour la réponse des barricades. La solution est développée pour le remblai totalement ou partiellement submergé (avec la nappe phréatique à différents niveaux). Des résultats expérimentaux et de modélisation numérique sont utilisés pour valider les équations proposées. Les résultats analytiques et numériques montrent que la pression totale sur une barricade peut être grandement augmentée par la pression d’eau dans les pores tandis que la contrainte effective est diminuée dans la galerie (par rapport à la condition drainée ou sèche). La solution proposée donne une méthode simple pour obtenir une estimation réaliste de contraintes totale et effective, et peut être utilisée comme base pour la conception des barricades.
|
DEWEY : |
550 |
ISSN : |
0008-3674 |
En ligne : |
http://rparticle.web-p.cisti.nrc.ca/rparticle/AbstractTemplateServlet?calyLang=f [...] |
in Canadian geotechnical journal > Vol. 46 N° 1 (Janvier 2009) . - pp. 47–56
[article] Horizontal pressure on barricades for backfilled stopes. Part II, Submerged conditions [texte imprimé] / Li, L., Auteur ; Michel Aubertin, Auteur . - pp. 47–56. Sciences de la Terre Langues : Anglais ( eng) in Canadian geotechnical journal > Vol. 46 N° 1 (Janvier 2009) . - pp. 47–56
Mots-clés : |
Backfill Barricades Total stress Effective Analytical solution Numerical modelling Remblai Contrainte totale effective Solution analytique Modélisation numérique |
Index. décimale : |
550 Sciences auxiliaires de la géologie. |
Résumé : |
This paper presents a method to calculate the pressure generated by submerged backfill on barricades (or bulkheads) located in drifts at the base of mine stopes. The paper complements Part I (see companion paper, this isue), which presents an analytical solution for the pressure on barricades when the backfill is in drained conditions (after the pore-water pressure has dissipated). The solution presented here applies shortly after backfill deposition, for undrained conditions. In this case, the effect of pore pressure cannot be neglected as it may be critical for the response of barricades. The solution is developed for totally or partly submerged backfill (with the water table at various elevations). Experimental testing and numerical modelling results are used to validate the proposed equations. Both numerical and analytical results show that the total pressure on barricades can be significantly increased by pore pressure, while the effective stress is decreased in the access drifts (compared to dry or drained conditions). The proposed solution provides a simple method to obtain a realistic estimate of the total and effective stresses, and can thus be used as a basis for barricade design.
Cet article présente une méthode pour calculer la pression générée par des remblais submergés sur des barricades localisées dans des galeries en bas des chantiers remblayés. Cet article complémente la Partie I (voir article précédent, ce numéro), qui a présenté une solution analytique pour la pression sur des barricades lorsque le remblai est sous la condition drainée (après que la pression interstitielle soit dissipée). La solution présentée ici s’applique peu après la déposition du remblai, en conditions non drainées. Dans ce cas, la pression interstitielle ne peut pas être négligée car elle peut devenir critique pour la réponse des barricades. La solution est développée pour le remblai totalement ou partiellement submergé (avec la nappe phréatique à différents niveaux). Des résultats expérimentaux et de modélisation numérique sont utilisés pour valider les équations proposées. Les résultats analytiques et numériques montrent que la pression totale sur une barricade peut être grandement augmentée par la pression d’eau dans les pores tandis que la contrainte effective est diminuée dans la galerie (par rapport à la condition drainée ou sèche). La solution proposée donne une méthode simple pour obtenir une estimation réaliste de contraintes totale et effective, et peut être utilisée comme base pour la conception des barricades.
|
DEWEY : |