| Titre : | New constructive heuristics for the total weighted tardiness problem (2011) |
| Auteurs : | Yoon, S. H., Auteur ; Lee, I. S., Auteur |
| Type de document : | Article : texte imprimé |
| Dans : | Journal of the operational research society (JORS) (Vol. 62 N° 1, Janvier 2011) |
| Article en page(s) : | pp. 232–237 |
| Note générale : | Recherche opérationnelle |
| Langues : | Anglais |
| Index. décimale : | 001.424 |
| Tags : | Single-machine scheduling Total weighted tardiness Constructive heuristics |
| Résumé : | This note considers the single-machine total weighted tardiness problem. Three new heuristic algorithms are suggested and compared with other competing heuristics from the literature, such as Apparent Tardiness Cost, Weighted Covert and Weighted Modified Due Date. The experimental tests show that the suggested heuristic algorithms outperform the existing heuristics. |
| DEWEY : | 001.424 |
| ISSN : | 0160-5682 |
| En ligne : | http://www.palgrave-journals.com/jors/journal/v62/n1/abs/jors2009186a.html |

