| Titre : | A note: a due-window assignment problem on parallel identical machines (2011) |
| Auteurs : | Mosheiov, G., Auteur ; Sarig, A., Auteur |
| Type de document : | Article : texte imprimé |
| Dans : | Journal of the operational research society (JORS) (Vol. 62 N° 1, Janvier 2011) |
| Article en page(s) : | pp. 238–241 |
| Note générale : | Recherche opérationnelle |
| Langues : | Anglais |
| Index. décimale : | 001.424 |
| Tags : | Scheduling Parallel machines Earliness–tardiness Due-window Assignment problem |
| Résumé : | We solve a due-window assignment problem on parallel identical machines. In addition to the standard objective of finding the optimal job schedule, in due-window assignment problems one has to assign a time interval during which goods are delivered to customers with no cost. Jobs scheduled prior to or after the due-window are penalized according to their earliness/tardiness value. We assume that jobs have identical processing times, but may have job-dependent earliness and tardiness costs (eg, due to possible different destinations). We show that the problem can be reduced to a non-standard asymmetric assignment problem, and introduce an efficient (O(n4)) solution procedure. |
| DEWEY : | 001.424 |
| ISSN : | 0160-5682 |
| En ligne : | http://www.palgrave-journals.com/jors/journal/v62/n1/abs/jors2009179a.html |

