| Titre : | Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time (2011) |
| Auteurs : | Nekoiemehr, N., Auteur ; Moslehi, G., Auteur |
| Type de document : | Article : texte imprimé |
| Dans : | Journal of the operational research society (JORS) (Vol. 62 N° 7, Juillet 2011) |
| Article en page(s) : | pp. 1403–1412 |
| Note générale : | Recherche opérationnelle |
| Langues : | Anglais |
| Index. décimale : | 001.424 |
| Tags : | Scheduling Single machine Maximum earliness tardiness Setup time |
| Résumé : | This paper considers the problem of scheduling a given number of jobs on a single machine to minimize the sum of maximum earliness and maximum tardiness when sequence-dependent setup times exist (1|STsd|ETmax). In this paper, an optimal branch-and-bound algorithm is developed that involves the implementation of lower and upper bounding procedures as well as three dominance rules. For solving problems containing large numbers of jobs, a polynomial time-bounded heuristic algorithm is also proposed. Computational experiments demonstrate the effectiveness of the bounding and dominance rules in achieving optimal solutions in more than 97% of the instances. |