| Titre : | Equipment selection with heterogeneous fleets for multiple-period schedulesstar (2011) |
| Auteurs : | Burt, C., Auteur ; Caccetta, L., Auteur ; Welgama, P., Auteur |
| Type de document : | Article : texte imprimé |
| Dans : | Journal of the operational research society (JORS) (Vol. 62 N° 8, Août 2011) |
| Article en page(s) : | pp. 1498–1509 |
| Note générale : | Recherche opérationnelle |
| Langues : | Anglais |
| Index. décimale : | 001.424 |
| Tags : | OR in natural resources Integer programming Surface mining Equipment selection |
| Résumé : | In a simple surface mining scenario we consider a mine to have one mining location and dumpsite connected by a truck route. We determine a purchase and salvage policy for trucks and loaders, which minimises the cost of materials handling over a multiple period schedule. This problem becomes large scale when we consider large sets of equipment and long schedules. Pre-existing equipment can lead to heterogeneous fleets; non-uniformity in the operating cost function coupled with compatibility issues also adds to the complexity of the problem. We present an integer programme for this problem, where we introduce a specialised linear constraint set to ensure satisfaction of production requirements while accounting for equipment compatibility. Many aspects of the presented model, such as the consideration of multiple periods and pre-existing equipment, are novel for the mining industry and ensure that the model is both a new and advanced equipment selection tool. |
| DEWEY : | 001.424 |
| ISSN : | 0160-5682 |
| En ligne : | http://www.palgrave-journals.com/jors/journal/v62/n8/abs/jors2010107a.html |

