[article]
Titre : |
Ten-Stage Discrete Flood Routing For Dams Having Gated Spillways |
Titre original : |
Cheminement Discret d'Inondation de Dix-Étape Pour des Barrages Ayant Déclenché des Déversoirs |
Type de document : |
texte imprimé |
Auteurs : |
Haktanir, Tefaruk, Auteur ; Kisi, Özgur, Auteur |
Année de publication : |
2005 |
Article en page(s) : |
86-90 p. |
Note générale : |
Hydrologie, Hydraulique |
Langues : |
Anglais (eng) |
Mots-clés : |
Etapes Cheminement Hydrogrammes Inondation Barrage Déversoir Piscine Fleuve Turquie Eau |
Index. décimale : |
551.4/620 |
Résumé : |
Ten-stage operation policies for routing of flood hydrographs from very small magnitudes up to the probable maximum flood (PMF) for any dam having a gated spill way are suggested. The Gate opening rules are determined based on the recent pool level. Without having to predict the magnitude of the incoming flood hydrograph beforehand, the fixed rules of the ten-stage operation policy will provide quasi-optimum routing for any flood, wich are classified into 10 different groups. 0.1 PMF, 0.2 PMF,...., and PMF are the upper limits of the ten groups. When the PMF is routed, the rising and falling limbs of the outflow hydrograph make 10 sudden jumps and sudden drops at definite times and smoothly vary between steps. The Developed flood routing model is applied sequentially to Catalan and Seyhan dams on the Seyhan River in Turkey.
des politiques d'opération de Dix-étapes pour le cheminement des hydrogrammes d'inondation des grandeurs très petites jusqu'à l'inondation maximum probable (PMF) pour n'importe quel barrage ayant un déversoir à déchenchements périodiques sont suggérées. Les règles d'ouverture de porte sont déterminées ont basé au niveau récent de piscine. Sans devoir prévoir l'importance de l'hydrogramme entrant d'inondation à l'avance, les règles fixes de la politique d'opération d'dix-étape fourniront le cheminement d'quasi-optimum pour n'importe quelle inondation, qui sont classifiées dans 10 groupes différents. 0.1 PMF, 0.2 PMF...., et PMF sont les limites supérieures des dix groupes. Quand le PMF est conduit, les membres se levants et en chute de l'hydrogramme de sortie font 10 sauts soudains et baisses soudaines aux heures définies et changent soudaines entre les étapes. Le modèle développé de cheminement d'inondation est appliqué séquentiellement aux barrages de catalan et de Seyhan sur le fleuve de Seyhan en Turquie.
|
in Journal of hydrologic engineering > Vol. 6, N° 1 (Janvier 2001) . - 86-90 p.
[article] Ten-Stage Discrete Flood Routing For Dams Having Gated Spillways = Cheminement Discret d'Inondation de Dix-Étape Pour des Barrages Ayant Déclenché des Déversoirs [texte imprimé] / Haktanir, Tefaruk, Auteur ; Kisi, Özgur, Auteur . - 2005 . - 86-90 p. Hydrologie, Hydraulique Langues : Anglais ( eng) in Journal of hydrologic engineering > Vol. 6, N° 1 (Janvier 2001) . - 86-90 p.
Mots-clés : |
Etapes Cheminement Hydrogrammes Inondation Barrage Déversoir Piscine Fleuve Turquie Eau |
Index. décimale : |
551.4/620 |
Résumé : |
Ten-stage operation policies for routing of flood hydrographs from very small magnitudes up to the probable maximum flood (PMF) for any dam having a gated spill way are suggested. The Gate opening rules are determined based on the recent pool level. Without having to predict the magnitude of the incoming flood hydrograph beforehand, the fixed rules of the ten-stage operation policy will provide quasi-optimum routing for any flood, wich are classified into 10 different groups. 0.1 PMF, 0.2 PMF,...., and PMF are the upper limits of the ten groups. When the PMF is routed, the rising and falling limbs of the outflow hydrograph make 10 sudden jumps and sudden drops at definite times and smoothly vary between steps. The Developed flood routing model is applied sequentially to Catalan and Seyhan dams on the Seyhan River in Turkey.
des politiques d'opération de Dix-étapes pour le cheminement des hydrogrammes d'inondation des grandeurs très petites jusqu'à l'inondation maximum probable (PMF) pour n'importe quel barrage ayant un déversoir à déchenchements périodiques sont suggérées. Les règles d'ouverture de porte sont déterminées ont basé au niveau récent de piscine. Sans devoir prévoir l'importance de l'hydrogramme entrant d'inondation à l'avance, les règles fixes de la politique d'opération d'dix-étape fourniront le cheminement d'quasi-optimum pour n'importe quelle inondation, qui sont classifiées dans 10 groupes différents. 0.1 PMF, 0.2 PMF...., et PMF sont les limites supérieures des dix groupes. Quand le PMF est conduit, les membres se levants et en chute de l'hydrogramme de sortie font 10 sauts soudains et baisses soudaines aux heures définies et changent soudaines entre les étapes. Le modèle développé de cheminement d'inondation est appliqué séquentiellement aux barrages de catalan et de Seyhan sur le fleuve de Seyhan en Turquie.
|
|