| Titre : | Minimizing total flow time in the single-machine scheduling problem with periodic maintenance (2012) |
| Auteurs : | D. Xu, Auteur ; S. Xiong, Auteur |
| Type de document : | Article : texte imprimé |
| Dans : | Journal of the operational research society (JORS) (Vol. 63 N° 4, Avril 2012) |
| Article en page(s) : | p. 567 |
| Note générale : | Recherche opérationnelle |
| Langues : | Anglais |
| Index. décimale : | 001.424 |
| Note de contenu : | As we observe, the numerical example proposed by Chen (2006) is incorrect because the author does not follow the steps of their proposal heuristic algorithm to illustrate example 1. According to Step 1(i) of the heuristic algorithm proposed by Chen, we should have three batches each with a total processing time of T=8. |
| DEWEY : | 001.424 |
| ISSN : | 0160-5682 |
| En ligne : | http://www.palgrave-journals.com/jors/journal/v63/n4/full/jors201171a.html |

