[article]
Titre : |
Case studies on bermed excavation in Taipei silty soil |
Type de document : |
texte imprimé |
Auteurs : |
H. J. Liao, Auteur ; C. C. Lin, Auteur |
Article en page(s) : |
pp. 889–902 |
Note générale : |
Sciences de la Terre |
Langues : |
Anglais (eng) |
Mots-clés : |
Berm Excavation support Grout columns Silty soils Berme Support d’excavation Colonne de coulis Sols silteux |
Index. décimale : |
550 Sciences auxiliaires de la géologie. |
Résumé : |
Bermed excavation (deep excavation supported by an excavation wall and a berm) can be an economical method for basement construction in urban areas if ground movement around the excavation is not the primary concern and the excavation site is large and (or) irregular in shape. This paper reviews three bermed excavation projects carried out in the Taipei Basin. One project was successful, one was successful after near failure, and one was a failure. Ironically, extensive ground improvement work had been done for the near-failure and failure cases; but no ground improvement was done for the successful case. It is of interest to find the similarities and differences among these bermed excavation projects. The causes of instability that result in unsuccessful bermed excavation projects and the applications of limit equilibrium analysis to the stability of bermed excavation are also discussed here. These three cases show that the existence of grout columns does not help to effectively increase the stability of the berm if the original safety factor against sliding of a berm slope is less than 1.0 and the improvement ratio of grout columns is low (say
L’excavation en berme (excavation profonde supportée par le mur et la berme) peut être une méthode économique pour la construction d’un sous-sol dans les zones urbaines si les mouvements du sol autour de l’excavation ne sont pas un problème et si le site d’excavation est grand et (ou) de forme irrégulière. Cet article présente trois projets d’excavation en berme qui ont eu lieu dans le bassin de Taipei. Parmi ces trois projets, un était un succès, un deuxième a presque subi une rupture, et le troisième était un échec. Ironiquement, c’est sur dans les cas de la presque rupture et de la rupture que des travaux d’amélioration du terrain avaient été effectués; mais aucune amélioration de terrain a été fait dans le cas réussi. C’est alors d’intérêt de trouver les similarités et différences dans ces projets d’excavation en berme. Les causes d’instabilité qui résultent en projets d’excavation ratés et les applications de l’analyse d’équilibre limite de la stabilité de l’excavation en berme sont aussi discutées. À partir de ces trois cas, il a été démontré que si le facteur de sécurité original pour prévenir le glissement de la pente de la berme est inférieur à 1,0 et que le ratio d’amélioration des colonnes de coulis est faible (environ
|
DEWEY : |
550 |
ISSN : |
0008-3674 |
En ligne : |
http://rparticle.web-p.cisti.nrc.ca/rparticle/AbstractTemplateServlet?calyLang=f [...] |
in Canadian geotechnical journal > Vol. 46 N° 8 (Août 2009) . - pp. 889–902
[article] Case studies on bermed excavation in Taipei silty soil [texte imprimé] / H. J. Liao, Auteur ; C. C. Lin, Auteur . - pp. 889–902. Sciences de la Terre Langues : Anglais ( eng) in Canadian geotechnical journal > Vol. 46 N° 8 (Août 2009) . - pp. 889–902
Mots-clés : |
Berm Excavation support Grout columns Silty soils Berme Support d’excavation Colonne de coulis Sols silteux |
Index. décimale : |
550 Sciences auxiliaires de la géologie. |
Résumé : |
Bermed excavation (deep excavation supported by an excavation wall and a berm) can be an economical method for basement construction in urban areas if ground movement around the excavation is not the primary concern and the excavation site is large and (or) irregular in shape. This paper reviews three bermed excavation projects carried out in the Taipei Basin. One project was successful, one was successful after near failure, and one was a failure. Ironically, extensive ground improvement work had been done for the near-failure and failure cases; but no ground improvement was done for the successful case. It is of interest to find the similarities and differences among these bermed excavation projects. The causes of instability that result in unsuccessful bermed excavation projects and the applications of limit equilibrium analysis to the stability of bermed excavation are also discussed here. These three cases show that the existence of grout columns does not help to effectively increase the stability of the berm if the original safety factor against sliding of a berm slope is less than 1.0 and the improvement ratio of grout columns is low (say
L’excavation en berme (excavation profonde supportée par le mur et la berme) peut être une méthode économique pour la construction d’un sous-sol dans les zones urbaines si les mouvements du sol autour de l’excavation ne sont pas un problème et si le site d’excavation est grand et (ou) de forme irrégulière. Cet article présente trois projets d’excavation en berme qui ont eu lieu dans le bassin de Taipei. Parmi ces trois projets, un était un succès, un deuxième a presque subi une rupture, et le troisième était un échec. Ironiquement, c’est sur dans les cas de la presque rupture et de la rupture que des travaux d’amélioration du terrain avaient été effectués; mais aucune amélioration de terrain a été fait dans le cas réussi. C’est alors d’intérêt de trouver les similarités et différences dans ces projets d’excavation en berme. Les causes d’instabilité qui résultent en projets d’excavation ratés et les applications de l’analyse d’équilibre limite de la stabilité de l’excavation en berme sont aussi discutées. À partir de ces trois cas, il a été démontré que si le facteur de sécurité original pour prévenir le glissement de la pente de la berme est inférieur à 1,0 et que le ratio d’amélioration des colonnes de coulis est faible (environ
|
DEWEY : |
550 |
ISSN : |
0008-3674 |
En ligne : |
http://rparticle.web-p.cisti.nrc.ca/rparticle/AbstractTemplateServlet?calyLang=f [...] |
|