Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time |
Type de document : |
texte imprimé |
Auteurs : |
Nekoiemehr, N., Auteur ; Moslehi, G., Auteur |
Année de publication : |
2011 |
Article en page(s) : |
pp. 1403–1412 |
Note générale : |
Recherche opérationnelle |
Langues : |
Anglais (eng) |
Mots-clés : |
Scheduling Single machine Maximum earliness tardiness Setup time |
Index. décimale : |
001.424 |
Résumé : |
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize the sum of maximum earliness and maximum tardiness when sequence-dependent setup times exist (1|STsd|ETmax). In this paper, an optimal branch-and-bound algorithm is developed that involves the implementation of lower and upper bounding procedures as well as three dominance rules. For solving problems containing large numbers of jobs, a polynomial time-bounded heuristic algorithm is also proposed. Computational experiments demonstrate the effectiveness of the bounding and dominance rules in achieving optimal solutions in more than 97% of the instances. |
DEWEY : |
001.424 |
ISSN : |
0160-5682 |
En ligne : |
http://www.palgrave-journals.com/jors/journal/v62/n7/abs/jors201094a.html |
in Journal of the operational research society (JORS) > Vol. 62 N° 7 (Juillet 2011) . - pp. 1403–1412
[article] Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time [texte imprimé] / Nekoiemehr, N., Auteur ; Moslehi, G., Auteur . - 2011 . - pp. 1403–1412. Recherche opérationnelle Langues : Anglais ( eng) in Journal of the operational research society (JORS) > Vol. 62 N° 7 (Juillet 2011) . - pp. 1403–1412
Mots-clés : |
Scheduling Single machine Maximum earliness tardiness Setup time |
Index. décimale : |
001.424 |
Résumé : |
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize the sum of maximum earliness and maximum tardiness when sequence-dependent setup times exist (1|STsd|ETmax). In this paper, an optimal branch-and-bound algorithm is developed that involves the implementation of lower and upper bounding procedures as well as three dominance rules. For solving problems containing large numbers of jobs, a polynomial time-bounded heuristic algorithm is also proposed. Computational experiments demonstrate the effectiveness of the bounding and dominance rules in achieving optimal solutions in more than 97% of the instances. |